Install
Elul 5808 אלול תת״ח
August-September 2048: 29 days, from Monday, August 10, 2048 to Monday, September 7, 2048.
| Sun | Mon | Tue | Wed | Thu | Fri | Shabbat |
|---|---|---|---|---|---|---|
Mon 1 א׳ Aug 10
| Tue 2 ב׳ Aug 11 | Wed 3 ג׳ Aug 12 | Thu 4 ד׳ Aug 13 | Fri 5 ה׳ Aug 14
| Shabbat 6 ו׳ Aug 15
| |
| Sun 7 ז׳ Aug 16 | Mon 8 ח׳ Aug 17 | Tue 9 ט׳ Aug 18 | Wed 10 י׳ Aug 19 | Thu 11 י״א Aug 20 | Fri 12 י״ב Aug 21
| Shabbat 13 י״ג Aug 22
|
| Sun 14 י״ד Aug 23 | Mon 15 ט״ו Aug 24 | Tue 16 ט״ז Aug 25 | Wed 17 י״ז Aug 26 | Thu 18 י״ח Aug 27 | Fri 19 י״ט Aug 28
| Shabbat 20 כ׳ Aug 29
|
| Sun 21 כ״א Aug 30 | Mon 22 כ״ב Aug 31 | Tue 23 כ״ג Sep 1 | Wed 24 כ״ד Sep 2 | Thu 25 כ״ה Sep 3 | Fri 26 כ״ו Sep 4
| Shabbat 27 כ״ז Sep 5
|
| Sun 28 כ״ח Sep 6 | Mon 29 כ״ט Sep 7
|
The month
- Molad
- Sunday, 3:58 pm and 2 chalakim (Aug 9; traditional reckoning, Jerusalem) · Molad and Kiddush Levana
- Whole year
- 5808