Install
Iyar 5819 אייר תתי״ט
April-May 2059: 29 days, from Monday, April 14, 2059 to Monday, May 12, 2059.
| Sun | Mon | Tue | Wed | Thu | Fri | Shabbat |
|---|---|---|---|---|---|---|
Mon 1 א׳ Apr 14
| Tue 2 ב׳ Apr 15 | Wed 3 ג׳ Apr 16 | Thu 4 ד׳ Apr 17 | Fri 5 ה׳ Apr 18
| Shabbat 6 ו׳ Apr 19
| |
| Sun 7 ז׳ Apr 20 | Mon 8 ח׳ Apr 21 | Tue 9 ט׳ Apr 22 | Wed 10 י׳ Apr 23 | Thu 11 י״א Apr 24 | Fri 12 י״ב Apr 25
| Shabbat 13 י״ג Apr 26
|
| Sun 14 י״ד Apr 27 | Mon 15 ט״ו Apr 28 | Tue 16 ט״ז Apr 29 | Wed 17 י״ז Apr 30 | Thu 18 י״ח May 1 | Fri 19 י״ט May 2
| Shabbat 20 כ׳ May 3
|
| Sun 21 כ״א May 4 | Mon 22 כ״ב May 5 | Tue 23 כ״ג May 6 | Wed 24 כ״ד May 7 | Thu 25 כ״ה May 8 | Fri 26 כ״ו May 9
| Shabbat 27 כ״ז May 10
|
| Sun 28 כ״ח May 11 | Mon 29 כ״ט May 12 |
The month
- Molad
- Saturday, 4:53 pm and 8 chalakim (Apr 12; traditional reckoning, Jerusalem) · Molad and Kiddush Levana
- Whole year
- 5819